Infrastructure Compliance in
Minutes, Not Days
Meet Peregrine Suite AI—
your Telecom site-plan compliance agent

What once took days of manual review now happens in minutes. Peregrine compares vendor-drawn site plans against Ausgrid's NS-183 technical standards with AI precision—ensuring safety, compliance, and efficiency at scale.
The Industrial Challenge
Manual audits of site plans face critical obstacles
Time-consuming reviews—days or even weeks lost per plan.
Inconsistent interpretations of Ausgrid’s technical specifications.
Risk of costly delays to project timelines or failed builds due to non-compliance.
Limited audit readiness and traceability in documentation.
How Peregrine Suite AI Operates
Plan Ingest & Standard Parsing
Accepts all common plan formats (PDF, CAD, DWG).
Automatically extracts key elements: pole positions, cable routing, distances, equipment specs.
Encodes them into a structured compliance-ready model.
Step 1
Apply Ausgrid NS-183 Compliance Rules
Ingests and interprets rules from Ausgrid’s NS-183 standard—such as minimum clearances, safety margin, conductor spacing, and equipment placement.
Converts textual norms into logical validation checks.
Flag issues like improper clearances, insufficient spacing, or misaligned infrastructural components.
Step 2
AI-Driven Issue Detection & Annotation
Highlights discrepancies on plan visuals.
For example: “Conductor-to-ground clearance at pole 3 is 220 mm under the required 300 mm.”
Suggests corrective actions—e.g., “Shift element 50 mm north.”
Step 3
Generate Compliance Confirmation Report
Auto-populates a structured report including:
Summary of compliant versus non-compliant checks.
Visual plan annotations pointing to flagged issues.
Severity grading (Critical / Warning / Advisory).
Suggested remediation steps.
Deliverables available as:
PDF report,
Annotated CAD/DWG markup,
Dashboard summary for quick review.
Step 4
Continuous Learning & Adaptation
Incorporates reviewer feedback to refine interpretation (e.g., acceptable rule variations or exceptions).
Learns from historical corrections, improving future review speed and accuracy.
Step 5
Case Study in Action
Metric
Review Time per Plan
Accuracy/Compliance Capture
Human Review Workload
Rejection Rate
Audit-Ready Documentation
Before Peregrine
2–3 days
~80%, manual errors
Heavy (hours per plan)
10–15% post-submission
Manual creation overhead
After Peregrine
5–10 minutes
>99%, automated precision
Light (minutes per plan)
<2% pre-submission
Auto-generated on-demand
Why It Matters for Telecom Teams
Speed
Accelerate infrastructure build cycles by clearing compliance checks in minutes.
Consistency
Eliminate variability in manual interpretations of NS-183.
Safety & Reliability
Enforce network integrity and safety standards rigorously.
Reduced Risk
Catch issues early—before construction or approval delays occur.
Auditability
Always-on visibility with full logs and annotated documentation.
Scalability
Handle growing plan volumes with minimal human oversight.
Ready to Elevate Your Compliance Workflow?
With Peregrine Suite AI, every site plan is reviewed, validated, and confirmed compliant—before delays ever happen. Let’s talk about integrating a smarter compliance layer into your telecom infrastructure process.
